Tucker, GA

CONTRACTOR

Systems Technologies Corp.

ARCHITECTURAL & ACOUSTIC CONSIDERATIONS

Antioch-Lithonia Missionary Baptist Church has a seating capacity

of more than 1,800. The church required high quality acoustics and

good syllabus to seamlessly switch from preaching the teaching of

high praise to concerts. To meet these requirements, STC selected

the OAP T-1502, Q-2500, UBF-822, TR-218 and SM-115. The

TR-218 subs were built into the stage steps.

AUDIO EQUIPMENT SELECTED

Q-2500 SS | SM-115 | T-1502 | TR-218 | UBF-822